Add a name to an edge (e.g. A) to populate this table.
Shortest Path (Dijkstra's)
Maximum Flow / Minimum Cut
Crash the Project
Import Activity Table
Paste a table straight from Word, Excel or Sheets, or choose a CSV file.
Columns: Activity, Duration, Immediate predecessors (a header row is optional).
Separate several predecessors with commas, spaces or semicolons; use - or leave the cell blank for none.
The network is built for you, with dummy activities added where needed.